NAFFCO 4-Way Fire Brigade Connection (Breeching Inlet) NWR 115 — Kitemark

            • Primary Purpose: Provides an external fire brigade access point to pump high-volume water directly into a building’s dry riser firefighting network.

            • Key Specifications: Model NWR 115, 6-inch (150 mm) flanged outlet, four 2.5-inch BS 336 male instantaneous inlets, 10 bar working pressure, BSI Kitemark & LPCB certified to BS 5041 Part 3.

            • Customer Benefits: Prevents backflow through integrated spring-loaded non-return valves, protects internal piping from rust with full interior/exterior red coating, and speeds up emergency hose connection.

            • Bangladesh Market Relevance: Engineered for high-rise commercial towers, RMG textile factories, and industrial facilities across Bangladesh requiring BNBC, FSCD, and international audit compliance.

Best Price Guaranteed

Description

Product Overview

What is this product?The NAFFCO NWR 115 is a heavy-duty 4-Way Fire Brigade Connection (6″ x 4-Way Breeching Inlet) engineered for dry riser firefighting systems in mid-rise and high-rise structures.

How does it work? Installed at fire brigade access level (typically inside a recessed external wall cabinet), the unit connects four 2.5-inch fire service delivery hoses to a single 150 mm (6-inch) vertical dry riser main. When firefighters pump water from fire appliances into the inlets, internal spring-loaded mushroom-type non-return valves open under pressure and automatically seal shut when pumping stops—preventing reverse flow and allowing the system to be safely drained via the integrated PN16 drain valve.

Who needs this product? MEP contractors, fire protection engineers, industrial facility managers, and commercial building developers designing or upgrading dry riser hydrant networks.

Why is it useful in Bangladesh? Rapidly verticalizing commercial hubs in Dhaka and Chattogram, alongside large-scale RMG factories and industrial parks in Gazipur and Narayanganj, rely on dry risers where fire service pumpers must charge upper-floor landing valves quickly. The BSI Kitemark and LPCB-certified NAFFCO NWR 115 ensures rapid hose coupling and strict compliance with Bangladesh National Building Code (BNBC) and Fire Service & Civil Defence (FSCD) inspection requirements.

Key Features

  • BSI Kitemark & LPCB Certified: Manufactured and third-party certified to BS 5041 Part 3:1975 for verified dry riser firefighting performance.

  • Four BS 336 Male Instantaneous Inlets: Fitted with 4 nos. 2.5-inch copper alloy male instantaneous couplings (BS 336:2010) with protective plastic blank caps.

  • Integrated Non-Return Valves: Each inlet features an independent spring-loaded mushroom-type copper alloy non-return valve to prevent backflow and allow single-hose or multi-hose operation.

  • Ductile Iron Body: Cast from high-strength spheroidal graphite cast iron (BS EN 1563:2011) for superior mechanical impact and pressure resistance.

  • Full Interior & Exterior Red Coating: Coated both internally and externally in corrosion-resistant fire-red finish to prevent rust in normally dry riser piping.

  • Integrated Drain Valve Assembly: Includes a BS 5154 PN16 copper alloy drain valve with a blank cap for complete post-operation water drainage.

Technical Advantages

  • High Flow Capacity: The 150 mm (6-inch) flanged outlet (drilled to BS 4504 Part 2 Table 16/21) supports simultaneous pumping from four fire service lines without flow bottlenecks.

  • 20 Bar Hydrostatic Test Integrity: Rated for 10 bar normal working pressure and factory-tested to 20 bar to withstand fire engine surge pressures.

  • Corrosion-Resistant Wetted Trim: Copper alloy (BS EN 12163:2011) inlets, non-return valves, and drain assembly resist seizing and oxidation over long idle periods.

  • Easy Maintenance & Inspection: Accessible blank caps, removable non-return components, and a dedicated drain valve simplify periodic dry riser pressure testing and servicing.

Applications

  • High-Rise Commercial & Residential Towers: Apartments, corporate offices, hotels, and shopping malls equipped with dry riser landing valve networks.

  • Industrial & RMG Factories: Multi-story garment factories, textile mills, and heavy manufacturing plants across Gazipur, Ashulia, Savar, and Narayanganj.

  • Warehouses & Logistics Hubs: Large storage facilities requiring external fire brigade water injection points.

  • Institutional & Project Installations: Hospitals, universities, airports, and government infrastructure projects built to British and BNBC fire codes.

Why Choose This Product?

  • Globally Recognized Certification: Dual BSI Kitemark and LPCB approvals eliminate compliance bottlenecks during factory fire safety audits.

  • Rugged Engineering: Ductile iron housing paired with copper alloy internals delivers decades of dependable standby service.

  • Cost-Effective Lifecycle Value: Internal red protective paint and corrosion-proof valve seats minimize seizure risk and replacement expenses.

  • Trusted Supply in Bangladesh: Available through loopshop.com.bd with technical specification support and nationwide delivery from Loop Engineering.

4. Technical Specification Table

Specification Details
Model NWR 115
Brand NAFFCO
Product Type 4-Way Fire Brigade Connection (Breeching Inlet)
Certification BSI Kitemark & LPCB Certified (BS 5041 Part 3:1975)
Inlet Connections 4 Nos. 2.5″ Male Instantaneous (BS 336:2010)
Outlet Nominal Size 150 mm (6 Inch) Flanged Outlet
Flange Drilling Standard BS 4504 Part 2:1974 Table 16/21 (PCD 240 mm, 8 Holes Ø22 mm)
Normal Working Pressure 10 Bar
Hydrostatic Test Pressure 20 Bar
Operating Temperature 0°C to 38°C
Body Material Spheroidal Graphite Cast Iron (Ductile Iron) to BS EN 1563:2011
Inlet & Non-Return Valve Material Copper Alloy to BS EN 12163:2011
Non-Return Valve Type Spring-Loaded Mushroom Type (One per Inlet)
Drain Valve Copper Alloy (BS EN 12163:2011), BS 5154 PN16 Rated with Blank Cap
Finish / Coating Painted Fire Red Internally and Externally

5. Features List

  • ✓ BSI Kitemark & LPCB certified to BS 5041 Part 3:1975

  • ✓ 4 x 2.5″ BS 336 male instantaneous copper alloy inlet couplings

  • ✓ 150 mm (6″) flanged outlet drilled to BS 4504 Table 16/21

  • ✓ Independent spring-loaded mushroom non-return valve on each inlet

  • ✓ Heavy-duty ductile iron body painted red internally and externally

  • ✓ Integrated PN16 copper alloy drain valve with blank cap

  • ✓ 10 bar working pressure and 20 bar test pressure rating

6. Benefits For Customers

  • Rapid Fire Brigade Deployment: Standard BS 336 instantaneous couplings allow fire service crews to snap hoses in seconds without threading delays.

  • Prevents Backflow & Pressure Loss: Four independent spring-loaded check valves let firefighters charge the riser using one to four hoses simultaneously without water escaping from unused inlets.

  • Long-Term Corrosion Protection: Full internal and external red coating plus copper alloy internals prevent rust buildup inside dry riser pipes.

  • Hassle-Free Audit Approval in Bangladesh: Meets BNBC, FSCD, and international buyer fire safety compliance requirements for industrial and commercial buildings.

7. Installation & Maintenance Guide

Installation Requirements:

  • Mount the breeching inlet horizontally at fire brigade access level (typically 750 mm to 1,000 mm above finished ground level) inside a weather-resistant, glazed fire brigade inlet box facing the fire engine access road.

  • Bolt the 150 mm (6″) flanged outlet securely to the dry riser piping using a full-face gasket and M20 bolts matching BS 4504 Table 16/21 (PCD 240 mm).

  • Ensure adequate clearance beneath the body to operate the PN16 drain valve and remove its blank cap.

Maintenance Tips:

  • Inspect the four plastic inlet blank caps and rubber sealing washers every six months to ensure dust, insects, and debris cannot enter the non-return valves.

  • Manually depress each spring-loaded mushroom non-return valve during annual dry riser inspections to verify smooth spring travel and tight seating.

  • After wet pressure testing, open the copper alloy drain valve completely to evacuate all residual water so the riser remains strictly dry.

Safety Instructions:

  • Never install isolating gate or butterfly valves between the breeching inlet and the vertical dry riser main unless explicitly mandated by system design.

  • Depressurize the dry riser completely via upper landing valves and the bottom drain valve before unbolting the flange or servicing internal check valves.

8. FAQ Section

Q: What is the price of NAFFCO NWR 115 4-Way Breeching Inlet in Bangladesh? A: The price of the NAFFCO NWR 115 4-Way Fire Brigade Connection in Bangladesh depends on current import duties and order volume. Request an instant quote on loopshop.com.bd for current BDT pricing and project discounts.

Q: Where can I buy NAFFCO NWR 115 4-Way Breeching Inlet in Bangladesh? A: You can order genuine BSI Kitemark-certified NAFFCO NWR 115 breeching inlets online at loopshop.com.bd or through Loop Engineering, with fast delivery across Dhaka, Gazipur, Chattogram, Narayanganj, and nationwide.

Q: What warranty does this product have? A: The NAFFCO NWR 115 includes a manufacturer warranty against casting and material defects supplied through Loop Shop. Contact our team for formal warranty documentation for your project handover.

Q: Is this suitable for the Bangladesh climate? A: Yes. Its ductile iron body is painted red both internally and externally, and its wetted parts are made of corrosion-resistant copper alloy—protecting against high humidity and monsoon moisture across Bangladesh.

Q: How to install this product? A: Mount the inlet assembly inside an accessible external wall cabinet at ground/fire-brigade access level and bolt its 150 mm (6″) flange directly to the dry riser main using BS 4504 Table 16/21 flange hardware.

Q: Is the NAFFCO NWR 115 suitable for wet risers or dry risers? A: Model NWR 115 is specifically designed and certified for dry riser installations (normally empty piping charged by fire brigade pumps during an emergency).

Q: What certifications does the NAFFCO NWR 115 carry?A: It is certified by BSI Kitemark and LPCB in compliance with BS 5041 Part 3:1975, with BS 336:2010 instantaneous inlets and a BS 5154 PN16 drain valve.

Q: Can firefighters connect fewer than four hoses at once? A: Yes. Because each of the four inlets has its own independent spring-loaded mushroom non-return valve, water pumped into one or two inlets will not leak out of the unused inlets.

Q: What is the difference between NAFFCO NWR 115 and NWRX 115? A: Both share the same 6″ x 4-way dimensions and BS 5041 Part 3 design, while the NWR 115 is rated for a normal working pressure of 10 bar and the NWRX 115 is rated for elevated working pressures up to 16 bar.

Q: Does it come with inlet caps and a drain valve?A: Yes, the NAFFCO NWR 115 comes complete with four plastic inlet blank caps and a copper alloy PN16 drain valve fitted with a copper alloy blank cap.

Reviews

There are no reviews yet.

Be the first to review “NAFFCO 4-Way Fire Brigade Connection (Breeching Inlet) NWR 115 — Kitemark”

Your email address will not be published. Required fields are marked *

We Don't Just Sell Products, We Deliver Complete Solutions.

From planning to handover – Loop Shop is your single point MEP partner.

Expert Consultant

Get advised from our MEP Specialist

Supply & Installation

Professional installation by certified engineers

Testing & Commissioning

Ensuring system works perfectly

After Sales Support

AMC & 24/7 technical support

Have Project in Mind?

Get free and consultations and quotation for your project. 

Need Help Deciding?

Leave your number and we'll contact you with the best offer.


Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/loopshop/public_html/wp-includes/functions.php on line 5581